How to Download the Building Schedule of Rates for Sri Lanka (2022)
The Building Schedule of Rates (BSR) is a document that provides the standard rates for various construction materials and activities in Sri Lanka. The BSR is revised annually by the Engineering Organization of the Western Province Chief Secretary's Office, based on the market prices and inflation rates.
The BSR is useful for contractors, consultants, engineers, architects, and other stakeholders involved in the construction industry. It helps them to estimate the cost of projects, prepare bids, and evaluate tenders. The BSR also serves as a reference for government authorities and regulatory bodies.
Bsr 2013 Sri Lanka Pdf Download
Download Zip: https://oradlolign.blogspot.com/?download=2tG56V
The latest version of the BSR for Sri Lanka is Revision 04, which was released on 23 December 2022. It contains 12 sections covering different aspects of building construction, such as earthwork, concrete work, masonry work, carpentry work, plumbing work, electrical work, etc. The BSR also includes a material price list that shows the unit prices of various materials used in construction.
To download the BSR for Sri Lanka (2022), you can visit the official website of the Engineering Organization of the Western Province Chief Secretary's Office[^1^]. There you will find a link to download the BSR as a PDF file. You can also download the previous revisions of the BSR and the material price list from the same website.
The BSR is a valuable resource for anyone involved in the construction industry in Sri Lanka. It helps to ensure transparency, accuracy, and fairness in the estimation and evaluation of construction projects. By downloading and using the BSR, you can benefit from the latest information and rates provided by the Engineering Organization.How to Use the BSR for Sri Lanka (2022)
Once you have downloaded the BSR for Sri Lanka (2022), you can use it to estimate the cost of your construction project. To do this, you need to follow these steps:
Identify the scope and specifications of your project. This includes the type, size, location, design, and quality of the project.
Select the relevant sections and items from the BSR that match your project. For example, if your project involves building a concrete wall, you need to select the section on concrete work and the item on reinforced concrete wall.
Measure the quantities of each item in your project. This involves calculating the length, width, height, area, volume, weight, or number of each item. You can use standard formulas or tools to do this.
Multiply the quantities by the unit rates given in the BSR. This will give you the cost of each item in your project. For example, if the unit rate for reinforced concrete wall is Rs. 15,000 per cubic meter and you have 10 cubic meters of wall, the cost is Rs. 150,000.
Add up the costs of all the items in your project. This will give you the total cost of your project. You can also add a contingency allowance of 10% to 15% to cover any unforeseen expenses or risks.
By following these steps, you can use the BSR for Sri Lanka (2022) to estimate the cost of your construction project. You can also use the BSR to prepare bids for tenders or evaluate tenders from other contractors. The BSR helps you to ensure that your bids are competitive and realistic. 29c81ba772